BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//wp-events-plugin.com//7.4.3//EN
BEGIN:VEVENT
UID:38@qbuildsoftware.com
DTSTART:20260916T120000Z
DTEND:20260916T134500Z
DTSTAMP:20260908T183825Z
URL:https://www.qbuildsoftware.com/events/events-infor-xa-integration-sess
 ions-sept-16/
SUMMARY:Infor XA Integration Sessions – September 16
DESCRIPTION:Streamline Engineering and Cutting Workflows in Infor XA\nTwo l
 ive sessions on September 16 showing how QBuild’s CADLink\, ECx Manager\
 , and NestLink connect design\, change management\, and cutting operations
  directly to Infor XA.\nSession 1 – Wed\, Sep 16\, 7:00AM-7:45AM\, Lapha
 m 1\nAutomate Your Nesting-to-Cutting Workflow with NestLink\nStill settin
 g up jobs manually in your nesting software? NestLink does the work for yo
 u. By integrating your nesting software directly with Infor XA\, NestLink 
 automatically sets up ready-to-run jobs on your cutting machines—no data
  entry required. The result: faster job setups\, reduced errors\, less mat
 erial waste\, and real-time visibility into true job costs in XA.\nIn this
  session\, you’ll learn how to:\n\n\n 	\nEliminate manual job setup by p
 ushing validated jobs from Infor XA directly to nesting and cutting system
 s.\n\n 	\nReduce errors and rework caused by mismatched part data\, quanti
 ties\, and revisions.\n\n 	\nCut material waste through more accurate\, sy
 stem-driven nesting inputs.\n\n 	\nGain real-time visibility into actual j
 ob costs and performance inside Infor XA.\n\n\nSession 2 –Wed\, Sep 16\,
  8:15AM-9:00AM\, Lapham 2\nBridging Design and Operations: Streamlining In
 for XA Workflows with CADLink and ECx Manager\n\nManual data entry of item
  revisions and BOMs\, email-based approvals\, and disconnected systems slo
 w down time-to-production and introduce costly engineering errors. Discove
 r how QBuild’s CADLink and ECx Manager seamlessly bridge your CAD/PDM/PL
 M systems with Infor XA ERP through unified\, bi-directional integration.\
 nIn this session\, you will explore how to:\n\n\n 	\nEliminate manual data
  entry: Sync CAD/PDM/PLM data\, item revisions\, and BOMs directly into In
 for XA to eliminate data discrepancies\, reduce engineering errors\, and a
 ccelerate time-to-production.\n\n 	\nCentralize change management: Automat
 e change request workflows with ECx Manager to keep cross-functional teams
  aligned from design to final assembly.\n\n 	\nBridge engineering and oper
 ations: Close the gap between design and production to ensure data accurac
 y and boost operational efficiency.\n\n\n\n
ATTACH;FMTTYPE=image/jpeg:https://www.qbuildsoftware.com/wp-content/upload
 s/inpower-2026.png
LOCATION:The Ingleside Hotel\, 2810 Golf Rd\, Pewaukee\, WI\, 53072\, Unite
 d States
X-APPLE-STRUCTURED-LOCATION;VALUE=URI;X-ADDRESS=2810 Golf Rd\, Pewaukee\, W
 I\, 53072\, United States;X-APPLE-RADIUS=100;X-TITLE=The Ingleside Hotel:g
 eo:0,0
END:VEVENT
END:VCALENDAR